Importance of Making a Construction Project Review Checklist

The beginning of a fresh construction project is an electrifying time. That anticipation can promptly modify to aggravation and even turn out to be a source of argument if there are errors along with discrepancies in building documents. Structure document quality control takes quite a bit of effort but would save both time as well as money in the long run. Provide yourself the most excellent possible chance for success with the subsequent tips for superiority control.

building design and construction plans

First of all, look at all of the building design and construction plans cautiously. Get rid of incomplete, unclear as well as ambiguous statements from the building plans. Make sure that papers do not disagree with each other. Make sure that the agreement documents plus specifications allocate work responsibility merely to the contractor. Describe all terms as required. Authenticate that all technical information is referenced. Take in report dates as well as revision along with addenda numbers.


Review the architectural, structural plus engineering plans through construction project review checklist to ensure that they have the same opinion. If alternates in building materials or methods are scheduled in the job stipulation make sure that the offer form includes consign for the bidder to put in prices for projected alternates. If bidding on introductory drawings makes sure that the up to date version is accessible and is being used. If all the drawings have been accepted, are all necessary signatures and dates shown? Most essentially, authenticate that the drawings that are being used are up to date.

Prepare a constructability review process and use it to recognize misplaced documents and documents that are required to be reorganized. This checklist could also be used to follow submittals as well as shop drawings during that phase of the project. Communicate with the proprietor, architect and engineer in relation to building document discrepancies so that they could be addressed and determined quickly.